Aqua-Tex Scientific Consulting, acting as project managers for the City of Kimberley, BC retained LaCas Consultants and Exp Services for the joint design and construction review of a replacement channel for the Mark Creek Flume Flood Management and Stream Rehabilitation Project. The purpose of the project was to combine engineering with biology in order to replace 180 lineal metres of failing concrete flume (construction in the 1950s) with an enhanced flood channel. Hydrological and hydraulic modeling was carried out to determine the water surface profiles within the flood channel including weirs, a ow flow channel and ponds. A second phase extending 200 m upstream has also been designed and is awaiting construction approval.
Hydrotechnical engineer: Brian LaCas, P.Eng., FEC (LaCas Consultants). Geotechnical engineer Evan Sykes, P.Eng. (Exp Services). project manager and biologist: Cori Barraclough, R. P. Bio (Aqua-Tex).
Remedial shoreline protection works and an intertidal marsh area were developed at the Langdale ferry terminal on BC’s Sunshine Coast in order to protect the shoreline from external storm surge, local wind setup and local wave setup as well as the create intertidal habitat. Using innovative techniques, this ecologically sustainable approach has provided shoreline protection to the terminal administration office, provided fisheries habitat, and improved plant diversity to set the groundwork for an enhanced shoreline.
Owner: BC Ferries. Project Manager: Brian LaCas, P.Eng., FEC LaCas Consultants. Environmental: Nova Pacific Environmental, Contractor: Fraser River pile and Dredge.
Mount Cook village, a major tourist destination in New Zealand’s Southern Alps, comprises a large hotel complex and supporting residential and commercial facilities. A previous study had reported a significant risk of debris flow and flood hazards immediately upslope of the development and proposed major preventative measures or relocation of the hotel. EBA Engineering Consultants Ltd and Graham Rawlings Consulting Ltd. In association with LaCas Consultants were retained by the Department of Conservation (Te Papa Atawhai) to reevaluate the debris flow problem, recommend that best means of protecting the village, and advise on land use planning with respect to natural hazards. It was concluded that debris flow protection could be achieved using remedial training dykes.
LaCas Constultants Inc. provided engineering design and supervision services for the construction of river engineering works on the Klaskish River on Vancouver Island. A 140 m section of fill road was constructed at the base of the rock slope using a combination of a rock-stack wall and rock riprap bank design, along with bioengineering works. The project maintained upper rock slope stability provided sediment control, minimized encroachment into the river and avoided the old growth nesting area for the marbled Murrelet.
Client/Contractor: Interfor, Hydrotechnical Engineering: Brian LaCas, P.Eng., FEC (LaCas Consultants Inc). Geotechnical Engineer: Mike Wise P.Eng. (Interfor).
Nova pacific Environmental retained LaCas Consultants for the design and construction supervision of channel and floodplain enhancements of Riverview Hospital lands in Coquitlam, BC referred to as “Rivervew Creek.” The purpose of the project was to combine hydrological engineering with biology in order to enhance the fisheries habitat, reduce scour/erosion and increase floodplain utilization, Channel enhancements included the design and installation of two new fisheries channels connected to a pond. Hydrological and Hydraulic modeling was carried out to determine the water surface profiles in the channels and the pond. The new channel/pond system will be connected to Riverview Creek during the 2012 fisheries window.
The District of Saanich retained LaCas Consultants (Brian LaCas P. Eng.) to design a multiyear phased restoration project on the Quicks Bottom wetland that was diked and farmed in the 1930s and overgrown with rye grass. Three finger channels were constructed into the wetland using a hydraulic excavator to construct a corduroy log road extending 70-100m. Upon retreat, the channel was excavated, and the corduroy road logs were placed as large woody debris. The finger channels help Colquitz Creek flow back into and out of the wetland, restoring it to pre-farming conditions.
LaCas Consultants Inc. was retained by Venture pacific Development Corporation to provide engineering design for flood control and erosion protection as part of the proposed 54 townhouse Creekside Village Development adjacent to Pemberton Creek. A 1 to 2 m high and 366 m long river training berm with a 4.5 m wide rock apron was designed to train flood and debris/ice flows past the development site.
Professionals Involved: Brian LaCas, P.Eng., FEC flood control (LaCas Consultants Inc): Nigel Skermer PEng, geohazards (EBA Engineering Ltd); im O’Brien PEng, geotechnical (MacLeod Geotechnical Ltd); Cam Anderson PEng, site services (C J Anderson Consultants Ltd). Contractor: The Sabre Group.
The District of Saanich and others retained LaCas Consultants to design a stream restoration project for Blenkinsop Creek. A 550 m long meandering channel that replaced an agriculture ditch was designed using specialized techniques and multidisciplinary approach. The primary design criteria was based on the proper functioning condition (PFC) technique developed by the USDA Forest Service and USDI Bureau of Land Management, PFC was the basis for best management practices to reconcile the municipality’s need to protect freshwater resources and the agricultural community’s need to maintain productive farmland. The District received the FCM-CH@M HILL Sustainable Community Aware 2002 for this project.
Professionals involved: LaCas Consultants (Brian LaCas, P.Eng., FEC). Biology/Ecology: Aqua-Tex Scientific Consultants. Contractor: Joseph Brown Contracting.
Terra Housing retained LaCas Consultants – Hydrological engineers and specialist in stream restoration – for the design and construction supervision of channel and floodplain enhancements of Quibble Creek in Surrey, BCV. The purpose of the project was to combine hydrological engineering with biology in order to enhance the fisheries habitat, reduce scour/erosion and increase floodplain utilization. Channel enhancement included the design and installation of five rock weirs, bank armouring and construction of a floodplain area. Hydrological and hydraulic modeling was carried out to ensure the weirs did not increase flooding.
Engineer: Brian LaCas, P.Eng., FEC (LaCas Consultants). Biologist: Bruce Wright RPBio (Nova pacific Environmental).
Vanoc retained LaCas Consultants, hydrological engineers, and specialist in stream restoration, for the design of a channel relocation of Boyd Creek on Whistler Mountain. The purpose of the project was to combine hydrological engineering with biology in order to re-route Boyd Creek in a new channel at the Timing Flats Finish Line of the 2010 Men’s and Women’s Downhill Race course. The project also required that the Coastal Tailed Frog (Ascaphus truei), a blue-listed species, have access to and be able to inhabit the new mountain side channel. Channel enhancement included rock weir, large woody debris and boulder placements. Hydrological and hydraulic modelling was carried out for the design of a new 200 m long channel at a 20% average gradient.
Engineer: Brian LaCas, P.Eng., FEC Leed AP (LaCas Consultants). Biologist: Jonathan Turner RPBio (Cascade Environmental Resource Group).
LaCas Consultants Inc. was retained by Blackcomb Skiing Enterprises Limited Partnership to provide an engineering design for debris flow, flood and erosion protection as part of a proposed townhouse development adjacent to Horstman Creek. A 6 m high and 140 m long river training berm was designed and constructed to train flood and debris flows past the development site.
Professionals involved: Brian LaCas, P.Eng., FEC, Project manager (LaCas) Consultants Inc); Nigel Skermer PEng, Geotechnical Engineer (EBA Engineering Consultants Ltd); Dr Peter Ward PEng, Hydrotechnical Engineer (Peter Ward PEng and Associates Ltd). Contractor: Coastal Mountain Excavation.
Stensen Creek Bridge Project, Retallack, BC, 1995
Hydrological analysis and bridge hydraulic design for a cat ski road.
Frederick Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Carol Creek Bridge Project, Revelstoke, BC, 1996
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
South Main 25KM Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Stephanie Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Tenas Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Corter Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Nadira Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Barbara Creek Bridge Project, Port Alberni, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 50 and 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Birch Creek Bridge Project, Creston, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Little Moyie Creek Bridge Project, Creston, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
O’Brien Creek Bridge Project, Creston, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control.
Spider Creek Bridge Project, Creston, BC, 1995
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Rogers Creek Bridge Project, Lillooet Lake, BC, 2005
Hydrological review and construction review for the Lillooet Lake Road 36 m long bridge replacement across Rogers Creek hydraulic design for a logging road including the determination of the 200-year return period flood levels, bridge waterway sizing with 1.5 metres freeboard and erosion control works,.
Britannia Creek and Mineral Creek Bridge Review Project, Britannia, BC, 2004
Hydrological analysis and bridge hydraulic design for a two existing vehicle bridges including the determination of the 200-year return period flood levels, design velocity, bridge waterway sizing and review of existing erosion control works.
Wood River Trib ‘A’ Bridge Project, Revelstoke, BC, 1996
Hydrological analysis and bridge hydraulic design for a logging road including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Misery Creek Audit of Bridge Failure, West Coast of BC, 1999
Carried out a forensic review of the Misery Creek logging road bridge (designed and built by others). Work included a site investigation, key hydraulic data collection, video and photo record, on-site construction inspection of emergency works, and preparing an emergency action plan to mitigate potential damage to fisheries habitat and to stabilize the crossing.
Nicklaus North Golf Course Fairway 1 & 3 Bridge Project, Whistler, BC, 1992
Hydrological analysis and bridge hydraulic design for a construction road including the determination of the 200-year return period flood levels, bridge scour depth calculations, bridge waterway sizing and erosion control works.
Resort Municipality of Whistler – Lorimer Road Bridge Project, Whistler, BC, 1989,
Project Engineer – bridge hydraulics study of the proposed $3 Million, 40 m long concrete bridge crossing Fitzsimmons Creek. Design included erosion protection works along the main channel and a side channel of Fitzsimmons Creek.
Klaskish River Road Alignment Design, INTERFOR, Port Hardy, BC, 1998
Design of road encroaching into riverbed. Hydraulic design of road berm and erosion and scour protection works.
Cheam Creek, Cheam First Nation, BC 2016
Responsible for hydrology and hydraulics and scour protection of a pipeline crossing Cheam Creek.
Horstman Creek Flood & Debris Torrent Control, Whistler BC, 1997
Design of a 140 m long river training berm with erosion control works to provide protection for development to be constructed on the slopes of Blackcomb Mountain. Work included an assessment of the upper watershed and channels of Horstman Creek to investigate potential sediment loading.
Venture Pacific Development Corporation, Pemberton, BC, 1994
Carried out a hydrological assessment and river training berm design on Pemberton Creek for a 54-townhouse development.
White Glacier Project, Whistler, BC, 2016
Design of river training berm along Nineteen-Mile Creek.
Klaskish River Bridges, Port Hardy Operations, BC, 1996
Carried out a hydrological review of 3 bridge crossings on the Klaskish River including the determination of the 100-year return period flood levels, bridge scour depth calculations, bridge waterway opening, and erosion control works.
Island Highway Nanaimo By-pass Project, Nanaimo, BC, 1982-1988
Water Management Engineer-review of highway bridge crossings and impact on the water resources of numerous creeks.
District of Hope, Hope, BC, 2017
Hydrological and hydraulic analysis for flood control on the lower Coquihalla River.
Fraser River, Mission, BC 2016
Preparation of spur dike designs along Fraser River for erosion/scour protection for the Fraser Pacific industrial lands.
Seymour River, District of North Vancouver, BC, 2015
Flood control engineering for a proposed dwelling along the Seymour River.
Gavles Creek, District of North Vancouver, BC, 2016
Responsible for hydraulic modeling of Gavles Creek and recommendations for flood control for a private property owner.
Waldorf School, Whistler, BC, 2013
Flood control review of school located on Fitzsimmons Creek floodplain.
Whistler Listel Hotel, Whistler, BC, 2007
Flood control design with flood control door and floodproofing for wine room.
Horstman Creek, Whistler, BC,1997
Flood control design of a river training berm.
Crabapple Creek, Whistler, BC, 2017
Flood control design for a floodwall along Whistler Golf Course.
Fraser River, Maple Ridge, BC, 2015
Recommendations for flood control for a warehouse/office project for MC Freight.
Aava Hotel, Whistler, BC, 2009
Flood control design for facilities in underground parking area.
District of Mission, Mission, BC, 1999
Preparation of flood control designs for temporary diking structures along the Fraser River.
City of Merritt, BC, 2020
Preparation of flood control and erosion control designs for Nicola River including hydrological analysis and hydraulic modeling.
Sundial Hotel, Whistler, BC, 2008
Flood control design for hotel office entrance and vent.
Steele Properties, Hope, BC, 2017
Responsible for the hydrological and hydraulic analysis for flood control on the lower Coquihalla River and flood control engineering for a subdivision.
Green Lakes Golf Course Project, Whistler, BC, 1990
Review of 1990 Flood on Fitzsimmons Creek and Green Lake impacts the proposed Green Lake Golf Course, (renamed the Nicklaus North Golf Course).
Paradise Trails Project, District of Squamish, BC, 2012
Responsible for hydrological and hydraulic analysis including a dam break analysis of a natural landslide dam on the Cheakamus River.
Resort Municipality of Whistler, Whistler, BC 2017
Responsible for the hydraulic design of a flood by pass channel design for Twenty-One Creek.
Three Points Development, Colwood, BC 2014
Flood control for land development project.
Resort Municipality of Whistler, Whistler, BC, 2017
Responsible for hydraulic design of the Fitzsimmons Creek Dry Channel and bike park,.
Resort Municipality of Whistler, Whistler, BC, 2016
Review of floodbox damage in White Gold Estates along White Gold Dike on Fitzsimmons Creek.
White Glacier Project, Whistler, BC, 2017
Responsible for the flood control for several areas of habitation including 1-D modeling and 2-D modeling as well as a transfer of risk assessment.
Nesters Crossing Project, Whistler, BC, 2017
Responsible for flood control for several areas of habitation including 1-D modeling and 2-D modeling as well as a transfer of risk assessment.
Whistler Creek Flood and Debris Flow Mitigation Project, Whistler, BC, 1997
Flood control and for Whistler Creek base for Whistler Mountain Ski Corporation.
Panorama Ridge Project, Whistler, BC, 2015
Responsible for hydrology and flood control for an unnamed drainage on Whistler Mountain, work included the design of a stepped flood channel.
Glencoe Stream and Tavern Creek, Mount Cook, New Zealand, 1996
International Project working with a consortium of engineers on a hazard assessment to road and infrastructure of The Hermitage Ski Resort.
Mark Creek Restoration, Kimberley, BC, 2015
Preparation of riparian restoration design and flood control modeling for Mark Creek flume project. 2017 Environmental Award, Engineers Geoscientists British Columbia.
Mosquito Creek Restoration, District of North Vancouver, BC, 1997
Design of a compensatory backwater channel works refuge, fish habitat restoration within Mosquito Creek Park. Design and construction review.
Fitzsimmons Creek Restoration, Whistler, BC, 1991
Carried out review and prepared designs for the restoration of Fitzsimmons Creek after the 1991 Flood.
Hobbs Creek Restoration, University of Victoria, BC, 2001
Provided design and construction inspection services for the installation of over 30 log weirs within Hobbs Creek at Mystic Vale. The weirs were specially designed to create riffle pool geomorphology, hydraulic diversity, floodplain utilization, reduce head-cutting and energy dissipation within the stream channel to enhance the existing stream channel geomorphology.
Swan Creek Restoration, Victoria, BC, 2000
Preparation of riparian restoration design and flood control modeling.
Langdale Creek Restoration, Gibsons BC
Preparation of a channel design and fish refuge channel for BC Ferries Inc.
Boyd Creek Relocation, Whistler BC, 2007
Preparation of a channel design and construction review of the relocation of Boyd Creek for the 2010 Olympics.
Maple Creek, Surrey, BC, 2016
Review of bank erosion and instream weir with recommendations for stream restoration.
Colquitz Creek, Saanich, BC, 2002
Provided the preliminary hydrological studies, finger channel design and construction supervision services for the restoration for Quick’s Bottom wetland, within the Colquitz Creek watershed.
Millar Creek Erosion Control Works & Fisheries Corridor, Whistler, BC, 1992
Design of 300 m of erosion control works and the provision of a fisheries corridor for riparian vegetation. Work site description and photograph published in BC Professional Magazine.
2010 Vancouver Olympics, Whistler, BC, 2004
Responsible for Phase I & II, Hydrology Study of the proposed cross-country, biathlon and ski jump venues at the Callaghan Valley.
Ministry of Environment, Penticton, BC, 1996
Carried out a Level 1 & 2 Interior Watershed Assessment of the Keremeos Creek watershed. Work included training local persons in hydrology and the Channel Assessment Procedure.
Twin Creek Watershed Assessment, Revelstoke, BC, 1996
Hydrological assessment to determine potential hydrological impact of future logging within the watershed.
Silver Star Mountain Watershed Assessment, Vernon, BC, 1997
Responsible for hydrological assessment of a proposed golf course, channel assessments on the headwaters of Coldstream Creek and Vance Creek, helicopter reconnaissance of watershed, hydrological analysis of rainfall, snowpack and peak stream flows, stream gauging and establishing wetland water level monitoring sites was carried out.
Gold Creek Reservoir Watershed Assessment, Cranbrook, BC, 1998
Carried out a channel assessment as part of a team for both Gold and Joseph Creeks which feed the Phillips Reservoir for Cranbrook, BC.
Jennis Lake Fish Habitat Restoration, Jennis Lake, BC, 1999
Work carried out included an on ground and helicopter video reconnaissance, collection of habitat information and dam site measurements, low-intensity fish survey, measurement of DO levels, sedimentation source identification, hydrometric survey, dam removal scenarios and restoration designs for fish habitat.
River of Golden Dreams, Hydrological Assessment, 1989
A hydrological study of the River of Golden Dreams (Alta Creek), for the Environmental Impact Assessment for the Green Lakes Golf Course project.
Ministry of Environment, Lillooet River Watershed, BC, 2001
Operational Inventory of Douglas Creek, Gowan Creek and Rogers Creek requiring the selecting of a suitable stream gauging and Hydrometric/Climate station site within the Squamish River watershed.
Ministry of Environment, Penticton, BC, 1996
Carried out a Level 1 & 2 Interior Watershed Assessment of the Shingle Creek watershed, including training local persons in hydrology and the Channel Assessment Procedure.
Ministry of Environment, Squamish, and BC, 1997
Carried out a Level 1 Coastal Watershed Assessment of the Squamish River watershed, including training local persons in hydrology and channel assessment procedure.
Fraser River, Mission, BC 2016
Preparation of preliminary spur dike designs along Fraser River for erosion/scour protection for the Fraser Pacific industrial lands.
BC Ferry Corporation, Langdale, BC, 2010
Preparation of the design of shoreline remedial works using rock riprap for the Langdale Ferry Terminal.
Fitzsimons Creek Erosion Control, Whistler, BC, 1999
Design and construction review of 300 m of erosion control works and the provision of a fisheries corridor for riparian vegetation.
Blenkinsop Creek Restoration Design, Saanich, BC, 2004
Designed a new 600m long meandering channel using specialized techniques and a multi-disciplinary approach to provide the farmer with a contiguous field simplifying access, irrigation and farm management.
Avalon Creek & Shoreline, Langdale, BC
Provided a hydrological assessment of Avalon Creek and river/shoreline engineering design to protect sediment basin facilities for the Avalon Dry Land Sort facility.
Market Creek & Reedville Creek, Surrey, BC, 2017
Responsible for the review of scour depths and hydraulic modeling of natural landslide damming of the creeks.
West Kettle River, Beaverdell, BC, 1995
Review of flood/erosion requirements for a development site along the West Kettle River.
Water Licensing Investigations, Vancouver Island, BC, 1982-1988
Water resource investigations of several watercourses to determine water availability for licencing under the BC Water Act.
Water Development Plan for Farm, Surrey, BC, 2016
Responsible for a water resource investigation of the Nicomekl River a blueberry farm’s short-term use of water for crop irrigation.
Trend Mine Expansion – Tumbler Ridge, BC, 2006
Prepared a surface water study for the environmental assessment and permit application for the expansion of the Trend Mine for Northern Energy & Mining Inc. The work included rainfall runoff modeling and pond sizing for 10 sub-catchment areas. In addition, a preliminary design was carried out for a diversion channel to divert a stream channel around an open pit operation. Hydrological and hydraulic review of weirs.
Perry Creek Mine Expansion – Tumbler Ridge, BC, 2007
Prepared a surface water study for the environmental assessment for Western Canada Coal Corporation. The work included rainfall runoff modeling and pond sizing for sub-catchment areas.
Efemcukuru Mine, Turkey, 2013
General hydrological review. Review of outlet channel profile and recommendation for channel design based on hydraulic modeling results
Ajax Mine, Kamloops, BC, 2015
Responsible for hydrological modeling for the, 200-year and PMF for Jacko Lake. Determination of the PMF storage volume for Jacko Lake.
Peace River Coal Mine, Tumbler Ridge, BC, 2014
Hydrological modeling for the 10-year, 200-year and PMF for the mine site. Open channel hydraulic modeling to determine ditch sizing and Roman Pond 1 and 2 for the 10-year volume and 200-year inlet/outlet works, plus construction drawings and reviews. Outlet work design and construction inspection included a measurement weir for both Roman Pond 1 and 2 spillway outlet channels. Design of several ditches and design of two PMF kick out lateral weirs.
Suncor, Fort McMurray, AB, 2005
Detailed hydrological modeling and river engineering design for artificial watershed on cap over Suncor pond with several channels and waterfalls. Modeling included using Proper Functioning Condition principles in the design as well as channel equilibrium design principles.
Questa Mine, Taos, New Mexico, 2006
Hydraulic sizing of tailings pond spillways. Special design of steep rock lined spillways.
Kisladag Mine, Turkey, 2013
Hydrological modeling of the North Dump for 100-year flood. Preliminary sizing of construction, phased and full mine ditching for EIA. Special preliminary design of drop structures. Review of 100-year flood storage requirements for ponds. Review and preliminary design of terrace ditch structures. Review of construction methods applicable to the mine site in Turkey.
Willow Creek Mine, Chetwyn, BC, 2009
Ditch sizing and North Pond 10-year volume and 200-year inlet/outlet works, plus construction drawings and reviews. Outlet work design and construction inspection included a concrete culvert constructed under the CN Rail. Design of a 3.6m dia. 90m long inlet pipe with an articulated concrete block spill pad design to prevent damage to the pond liner. Design of a 3m dia. culvert for ND2 including concrete cloth design of channel. Design of the emergency spillway for the North Pond with an articulated block spillway pad design. Recommendations for a decant pipeline flow monitoring device. Design of a spillway outlet works channel.
Quinsam Coal, Campbell River, BC, 2009
Hydrological modeling and hydraulic modeling for ditches, inlets and outlets. Evaporation and evapotranspiration model for 100-year time period to determine the variation in potential inundation of PAG in two ponds.
Chu Chua Mine Project – Barriere, BC, 1988-1991
Prepared a detailed regional hydrological study for the Stage 1 Environmental Assessment of the proposed Chu Chua Mine.
Mount Milligan Mine Project – Mackenzie, BC,1988-1991
Prepared a detailed regional hydrological study for the Stage 1 Environmental Assessment of the proposed Mount Milligan Mine.